2 people for 6 guitars ...

Algebra Level 1

At Pierre & co, the worker Pierre can craft a guitar in 4 days, while the young Paul can craft a guitar in 8 days.

If they were to work together, how many days will it take for them to craft 6 guitars?


The answer is 16.

This section requires Javascript.
You are seeing this because something didn't load right. We suggest you, (a) try refreshing the page, (b) enabling javascript if it is disabled on your browser and, finally, (c) loading the non-javascript version of this page . We're sorry about the hassle.

14 solutions

Kancharla Rahul
Apr 30, 2014

paul took 8days for 1 guitar meanwhile pierre prepare 2 guitars on 8days theys gonna prep 3 guitars so.doubling 16 days

why

Muhammad Awais Awan - 7 years, 1 month ago

Log in to reply

Follow the ratio method, 1 guitar 4 days (PIERE) , 1 guitar 8 days ( PAUL ) therefore, 6 guitar X days Hence : Sum of Ratio = 6/X 1/4 + 1/8 = 6/x HENCE X = 16 Look at my solution if you dont like Ratios

Syed Baqir - 5 years, 11 months ago

1/4+1/8=3/8.That means the work done is 8/3. Now multiply this by 6,that is 8/3*6=16

Anuj Shikarkhane - 6 years, 11 months ago
Genesis Dalisay
May 1, 2014

1/4+1/8=6/x

8x(1/4+1/8=6/x)

2x+x=48

x=16

Rahma Anggraeni
Apr 30, 2014

1 4 \frac{1}{4} + 1 8 \frac{1}{8} = 6 x \frac{6}{x}

2 + 1 8 \frac{2+1}{8} = 6 x \frac{6}{x}

3 8 \frac{3}{8} = 6 x \frac{6}{x}

x x = 16

So, they do it in 16 days.

grt!

Kartik Kwatra - 7 years, 1 month ago
Nikunj Luharuka
May 23, 2014

Total work done by both in one day 1/4+1/8=3/8 So 1 guitar will be completed in 8/3 days.. So 6 guitars in 8/3*6 = 16

Pierre as A, Paul as B

Work done by A in one day 1/4 Work done by B in one day 1/8

X (1/4+1/8)=6

X(2+1/8) =6

X (3/8) =6

X =6×8/3=16

Tamrin Al-Deen
May 2, 2014

After 8 days 3 guitars are crafted ( 2 by Pierre & 1 by Paul). So it takes 16 days (8+8=16 days) to craft 6 guitars (3+3=6 guitars)

gud one bro

Saurav Zuer - 7 years, 1 month ago

nice one pro

Mohamed Fathy - 6 years, 8 months ago

Rate at which paul and pierre work are x/4 and x/8 rspectively Let them take y days to prepare 6 guitars while working together

Y(x/4)+Y(x/8)=6x Y(x/4+x/8)=6x Y=16

Amrita Pritam - 6 years, 11 months ago
Emmanuel Jesús
Jan 13, 2021

PierreGuitars + PaulGuitars = 6

PierreGuitars = PierreDays/4 Paul guitars = PaulDays/8

As the days worked are the same for both, PierreDays and PaulDays they are the same. PierreDays = PaulDays = X

---we substitute in terms of X the first equation--- X/4 + X/8 = 6 => 3X/8 = 6
X = 2*8 = 16

Veselin Dimov
Dec 25, 2018

Each person has a p r o d u c t i v i t y productivity , which is the speed of making the guitar and shows what part of a guitar is made per day. And so Pall's p r o d u c t i v i t y productivity is 1 8 \frac{1}{8} and Pierre's is 1 4 \frac{1}{4} . If we let the needed days be x x we set the following equation: x ( 1 8 + 1 4 ) = 6 x\bigg(\frac{1}{8} + \frac {1}{4}\bigg)=6 x ( 1 8 + 2 8 ) = 6 x\bigg(\frac{1}{8} + \frac {2}{8}\bigg)=6 x ( 3 8 ) = 6 x\bigg(\frac{3}{8}\bigg)=6 x = 6 × 8 3 x=6×\frac{8}{3} x = 16 x=16 And therefore the needed days for the six guitars are 16 16 .

Syed Baqir
Jun 26, 2015

Lets make both equivalent to 8 days, let x be No. of guitars made: Piere = 2x while Paul = x IN 8 DAYS hence total guitar in 8 days is 3 so 6 = 2 *3 Same as 8 *2 = 16

Vivek Rao
Sep 21, 2014

Pierre and Paul work together.....as for pierre it takes 4 days to make one guitar i.e in 8 days he'll make 2 guitars meanwhile paul takes 8 days to make one guitar so in these 8 days of work together they'll make 3 guitars. Therefore in 16 days they'll make 6 guitars. Hope it clears your doubts.

Jay Mundra
Jun 1, 2014

For 1 guitar they together will take 1/4 +1/8=3/8 = 8/3 days. For making 6 guitars they will take 8/3*6 = 16 days

Manish Sarma
May 28, 2014

Together they work on 3/8 guitar in 1 day. So 6 guitars can be done in 1 8/3 6 days= 16 days.

John Dore
May 24, 2014

2 X ((4+4)//8) where // indicates a parallel process =2*8=16

Arun Pal
May 1, 2014

let total work=8 units(l.c.m of work done by pierre and paul) work done by pierre in a day =2units also work done by paul in a day = 1units so total work done by both in a day = 3 units 6 unit work will be done by them in = (8/3)*6=16 days

0 pending reports

×

Problem Loading...

Note Loading...

Set Loading...