A tower is composed of vertically stacked bricks. The first brick from the top to the bottom weighs mg, the second brick weighs mg, the third brick weighs mg and so on.
A demolition company wants to collapse the tower by only removing one of its bricks, such that the brick's weight is the smallest possible . The tower is granted to collapse if the weight of the bricks above the removed one is greater than the weight of the ones below.
Which brick from the bottom to the top must the company remove?
This section requires Javascript.
You are seeing this because something didn't load right. We suggest you, (a) try
refreshing the page, (b) enabling javascript if it is disabled on your browser and,
finally, (c)
loading the
non-javascript version of this page
. We're sorry about the hassle.
No explanations have been posted yet. Check back later!