With 900 people, work can be done in 730 days, with 900-250=650 people how long does it take to complete 900 people's worth of 730-455=275 days work? Answer is
(900/650)×275≈380 days. Why? The lesser the people, the longer the time it takes, which is why (900/650) ratio is taken instead of (650/900), I hope it helped, good day.