it's Snail time....

Algebra Level 1

A Snail covered 3 mm in the first sec and 4 mm each in each successive sec for a certain no. of secs. However if it had covered 1 mm in the first sec. and 8 mm more in each successive sec for some secs , then the difference between the length of the path it would have covered during the same time and the actual path that it actually took would have been more than 6 mm and less than 30 mm. Find the time for which the snail moved. Choose the correct option among the four.(The most appropriate one)

2 10 5 9

This section requires Javascript.
You are seeing this because something didn't load right. We suggest you, (a) try refreshing the page, (b) enabling javascript if it is disabled on your browser and, finally, (c) loading the non-javascript version of this page . We're sorry about the hassle.

0 solutions

No explanations have been posted yet. Check back later!

0 pending reports

×

Problem Loading...

Note Loading...

Set Loading...