Several construction workers are laying a foundation. Every day they pour in the same amount of concrete that is in the foundation already. For example, if there are three units of concrete on day one, then the workers will add three more units of concrete the next day making six. The next day, they will add six to make a total of twelve and so on. If it takes 88 days to fill the entire foundation with concrete, how many days does it take to fill one-eighth of the foundation?
This section requires Javascript.
You are seeing this because something didn't load right. We suggest you, (a) try
refreshing the page, (b) enabling javascript if it is disabled on your browser and,
finally, (c)
loading the
non-javascript version of this page
. We're sorry about the hassle.
The amount of concrete doubles each day, which means that the total amount of concrete was the half on the previous day.
Therefore, at the end of the:
87th day the foundation was 2 1 full
86th day the foundation was 4 1 full
85th day the foundation was 8 1 full
Therefore, our answer should be: 8 5