Work Work Work Question

Algebra Level 3

X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. Can you imagine how long will they together take to complete the work ?


The answer is 13.3337.

This section requires Javascript.
You are seeing this because something didn't load right. We suggest you, (a) try refreshing the page, (b) enabling javascript if it is disabled on your browser and, finally, (c) loading the non-javascript version of this page . We're sorry about the hassle.

1 solution

If X = 1/5 then Y = 4/5. If (4/5)Y = 16 days, then Y = 20 days.

Y = X/2.

X + X/2 = 20

X ≈ 13.334 days

And it is also possible to use Y + 2Y = 40.